Status of the Unit 2 at the time of the accident

Table of contents

  1. RPV pressure, PCV pressure, water level and dose rate, 11/Mar 12:00 to 28/Mar 0:00

Graph  (Click to enlarge)

Data was obtained from the web site of Tokyo Electric Power Company Holdings, Incorporated(TEPCO).
  1. RPV pressure, PCV pressure, water level and dose rate, 11/Mar 12:00 to 28/Mar 0:00

    RPV pressure
    PCV pressure
    water level
    dose rate
    (Data was obtained from TEPCO  )

    Click here to enlarge the range of 12/Mar 6:00 to 15/Mar 18:00â–¼