Information Portal for the Fukushima Daiichi Accident Analysis and Decommissioning Activities
Japanese
English
Search for:
Menu
Home
Site map
Decommissioning
Progress status
Strategic plan for fuel debris retrieval
FY2017
FY2016
Accident analysis
About Fukushima Daiichi NPS
Overview of the Accident
Event Sequences
Measured data
Measured data and Graphs
Charting tool
Status of the Unit 1
Status of the Unit 2
Status of the Unit 3
Status of the other
3D View
Temperature (Unit 1)
Temperature (Unit 2)
Temperature (Unit 3)
Radiation
Reactor piping system (Unit 1)
Reactor piping system (Unit 2)
Reactor piping system (Unit 3)
Reactor structure (Unit 1)
Reactor structure (Unit 2)
Reactor structure (Unit 3)
Document Search
Abbreviation search
Link
Related organizations
Reports
Status of the Unit 2 at the time of the accident
Table of contents
RPV pressure, PCV pressure, water level and dose rate, 11/Mar 12:00 to 28/Mar 0:00
Graph
(Click to enlarge)
Data was obtained from the web site of Tokyo Electric Power Company Holdings, Incorporated(TEPCO).
RPV pressure, PCV pressure, water level and dose rate, 11/Mar 12:00 to 28/Mar 0:00
(Data was obtained from
TEPCO
)
Click here to enlarge the range of 12/Mar 6:00 to 15/Mar 18:00â–¼