Status of the other

Table of contents

  1. PCV pressure
  2. Amount of water injection
  3. Water level in T/B
  4. Temperature change rate in spent fuel pool
  5. Cl- concentration in accumulated water in PCVs and turbine buildings
  6. 137Cs concentration in accumulated water in PCVs, torus rooms, turbine buildings, process main building and high temperature incinerator building
  7. 137Cs concentration in accumulated water of each building

Graph  (Click to enlarge)

Data was obtained from the web site of Tokyo Electric Power Company Holdings(TEPCO), Incorporated and Ministry of Economy, Trade and Industry(METI) and Japan Meteorological Agency(JMA).
  1. PCV pressure

    PCV pressure
    (Data was obtained from TEPCO  , JMA  )


  2. Amount of water injection

    water injection into the unit 1,2,3
    (Data was obtained from TEPCO  )


  3. Water level in T/B

    water level in T/B
    (Data was obtained from TEPCO  )


  4. Temperature change rate in spent fuel pool

    temperature change rate in spent fuel pool
    (Data was obtained from TEPCO  )


  5. Cl- concentration in accumulated water in PCVs and turbine buildings

    cl- concentration in accumulated water in PCVs and turbine buildings
    (Data was obtained from TEPCO and METI  )


  6. 137Cs concentration in accumulated water in PCVs, torus rooms, turbine buildings, process main building and high temperature incinerator building

    137Cs concentration in accumulated water in PCVs, torus rooms, turbine buildings, process main building and high temperature incinerator building
    (Data was obtained from TEPCO and METI  )


  7. 137Cs concentration in accumulated water of each building

    137Cs concentration in accumulated water of each building
    Information on the connectivity of each building was acquired from the Task Force for Land-Side Impermeable Walls.
    (Data was obtained from METI  )


back